Project Title & Location
FIRST NEIGHBORHOOD UNIT OF THE
MANILA-CAVITE COASTAL ROAD AND RECLAMATION PROJECT
Metro Manila, Philippines
Client
CONSTRUCTION DEVELOPMENT CORPORATION OF THE PHILIPPINES
Makati City
Project Completion
1978
Associated Firms
Urban Designers Associates, Inc.
Design Management and Development Corporation
Services Provided
- Master Planning
This project was the first to progress to detailed planning in the reclamation area. The project site comprises a gross area of 209 hectares. This includes the 25-hectare Marina located west of the landmass. With the property being sliced by three major thoroughfares, the neighborhood concept was unified functionally by proposing commercial land uses at the central spine running east-west and perpendicular to the three main roads.
Planning for the First Neighborhood Unit was directed at complementing existing land uses across Roxas Boulevard. The following development concepts were adopted for the project:
1. The neighborhood as a planning unit. The extent of the
neighborhood was physically defined as the territory that can easily be
traversed on foot.
2. The facilities were programmed to provide personal services and
institutional requirements of a self-contained neighborhood.
3. The provision of a variety of house-types to achieve a wide range
blending of residential structures that include social, environmental and
aesthetic considerations.
4. Allow mixed uses to integrate complementary land uses, to encourage
internal interaction and to minimize external travel.